Skip to content Skip to footer

New AEEG Resolution 786/2016

With Resolution 786/2016/R/eel of December 22, 2016, the Authority for Electricity Gas and Water System defines the timelines for the application of the new provisions set out in Variant V2 of CEI 0-16 (in the case of medium- and high-voltage connections to distribution networks) and the new edition of CEI 0-21, (in the case of generation plants to be connected to low-voltage networks) regarding inverters, interface protection systems and tests for storage systems.

 

 

Secsun Ltd. is an authorized body to carry out periodic relay test verifications, and is therefore available to all those who are required to comply with the obligations under this Resolution.

 

Leave a comment